THANK YOU FOR YOUR VOTE

77.6% OF ELIGIBLE VOTERS VOTED
THE PERCENTAGE OF YES VOTES IS 83%.
TOTAL NUMBER OF VOTES CAST IS 2,070.
THE NUMBER OF YES VOTES IS 1,719.
NUMBER OF NO VOTES IS 351.

Strengthening our Community

As you know, we’ve been working diligently to enhance your experience. Our original plans for the Base Lodge Expansion were met with challenges due to rising construction costs. We are now committed to delivering a project that meets your needs and aligns with our club’s vision.

Our revised plan focuses on delivering the core elements of our original vision, while staying within budget. We’re excited to share the key features of this project:

Frequently Asked Questions

Needs and Priorities

Declining interest rates, stabilized construction costs, and reduced local activity make this a financially optimal time to proceed. The club’s strong economic position supports the investment, while the Base Lodge kitchen and South Lodge require urgent upgrades. Delaying would risk higher costs and further competitiveness loss as neighbouring clubs. The BLE ensures our club remains modern, functional, and a leader in the region.

The expansion address current members’ needs while incorporating future-proofing, ensuring the club remains attractive and functional for future generations.
Lift upgrades and snowmaking improvements are included in the 50-year capital plan, ensuring they are not compromised by the BLE.
Future maintenance and improvements for the North Lodge are already budgeted in the 50-year plan. The BLE is designed to meet the needs of the membership now and into the future.
The BLE will be financed through a combination of existing funds and manageable debt, which is projected to be paid off within five years due to the club’s strong financial position.

Design and Functionality

The BLE is being designed by Normerica, the original designer and builder of the Base Lodge. The unique character of the lodge will not only be preserved but also enhanced with the addition of bright glass walls and stunning views of the hill, seamlessly blending with the existing structures to create a harmonious and updated space.
Features include an expanded kitchen and Marche area, a new adult lounge, additional family lockers, and additional upper level convenience washrooms.
The BLE adds 160 family lockers, accommodating current users and waitlist members. Ski storage solutions and interim locker arrangements are also planned and will be communicated.
The kitchen area will almost double in size by filling in the second-level loading dock and expanding into the new lodge area.
Yes, the BLE will include sufficient family lockers to accommodate current users and those on the waitlist. Temporary locker solutions will be provided during construction.
Acoustic treatments are planned for the adult lounge and expansion areas to minimize noise and enhance the member experience. These treatments have been factored into the budget. The club is evaluating the feasibility of adding acoustic treatment to the remainder of the existing Base Lodge to address the sound on a busy day.
Yes, the BLE will have a net-even seating capacity compared to the South Lodge’s current seating while addressing congestion issues with improved layouts.

The outdoor ski locker building will remain for at least one more ski season and will be reimagined in the future as part of long-term facility improvements.

The Depot is primarily utilized by families of the club, particularly those with young children, due to its convenient location in front of the Zipper (carpet) and Little John chairlifts. This location provides a great view for parents and serves as the meeting spot for young children’s programs. The Depot also houses a playroom on the lower level, further supporting its role as a family-friendly space. Additionally, it accommodates visiting racers and their families, with the lower level used for changing and preparation and the race office located on the upper level. The Depot is also used for events, allowing the Base Lodge Après Ski activities to continue while the Depot is closed early for nighttime parties. Alpine program staff and instructors meet on the upper level in the mornings.
 The South Lodge is still used by a small number of members who have lunch there, as well as those with lockers in the facility. Additionally, the Peak to Shore clinic is currently located in the South Lodge. Plans for the expanded Base Lodge include accommodating these users, with locker users being absorbed into the new Base Lodge and Depot, ensuring that all needs are met within the expanded facilities. The Peak to Shore clinic’s lease will end when the South Lodge is demolished.

Communication and Member Engagement

Regular updates will be shared via emails, newsletters, and member meetings. A comprehensive information package will be available on the website before the February vote.

Member surveys and listening sessions have shaped the project, and ongoing feedback will continue to be encouraged.

Voting will occur electronically through Simply Voting with results shared transparently through all club communication channels. Voting will open at the conclusion of the Town Hall on February 16th and remain open for seven days.

The club management aims for 100% voter turnout by providing clear communication, detailed information, and hosting member engagement events to answer questions and address concerns.

The South Lodge will be removed in April 2025. A farewell event is being planned to celebrate its history, followed by a well-organized transition to construction activities.

Operational and Logistical Impacts

The timeline for the BLE is as follows:

  • April 2025: Begin construction and remove the South Lodge.
  • Late 2025 – March 2026: Pause construction during the ski season to minimize disruption.
  • April 2026: Resume construction.
  • November 2026: Complete construction and open the expanded facilities. Efforts will minimize operational disruptions, including providing temporary facilities for impacted areas.

Temporary facilities for locker rooms and seating will be provided. Squires Johns will relocate to a trailer during construction.

Yes, the food service areas will be reconfigured and expanded to improve flow and capacity, meeting member needs during peak times.

Governance and Oversight

The Board has established a dedicated Base Lodge Expansion (BLE) construction team which will provide monthly reports to the Board of Directors. The General Manager is taking on the overall responsibility for this build and will be in contact communication with the building committee of the Board. to ensure the project adheres to its goals and timeline. The Club is committed to maintaining excellent communication with members by providing regular updates, sharing detailed financial information, and hosting Q&A sessions.

Contractors were selected based on their experience, reliability, and competitive pricing. Over 75% of hard costs have already been quoted.

The timeline includes clear milestones, and the 10% contingency ensures financial flexibility. The Board’s oversight will maintain adherence to the schedule and budget.

The 50-year capital plan ensures the BLE fits into the broader strategy, balancing current improvements with long-term sustainability.

When the original Base Lodge was built in 2004, the club incurred $2.5 million in debt to complete the project. This was a significant investment at the time, reflecting the club’s commitment to providing a high-quality facility for its members. The Debt that the proposed BLE would encounter is $2-4M, a modest sum on a relative basis. 

Maintaining the Old South Lodge in a functional state over the next 15 years is estimated to cost approximately $5 million. This estimate is based on wear, damage, and conditions that WSP Canada Inc. was able to see and inspect during their assessment. These costs would include necessary upgrades, repairs, and ongoing maintenance to ensure the facility remains operational in it’s current configuration. There would be an additional cost of approximately $1 million to repurpose and renovate existing spaces as well as $2 million to renovate and expand the Base Lodge Kitchen. However, this significant financial commitment underscores the importance of considering the Base Lodge Expansion, which would not only eliminate the need for continued investments in the aging South Lodge but also provide modernized and consolidated facilities to better meet the needs of the Craigleith community.

As part of Project Generations, $4.5 million was collected through an assessment, and these funds were fully used in the construction of the Depot. While the original Project Generations plan included a borrowing of $8 million, this borrowing was not utilized for the Depot. The Depot’s total cost of $10 million was covered using the collected assessment funds, Capital Levy, and new member initiation fees. For the upcoming Base Lodge Expansion (BLE) project, the anticipated debt is projected to range between $2 million and $4 million, depending on when the Little John chairlift is replaced.

If the membership declines the Board’s proposal, the South Lodge will still be removed, leaving the club to operate within the existing spaces without any of the planned enhancements. This would mean no additional seating to offset the loss of the South Lodge, no adult lounge, and no expanded kitchen space to improve food services. Furthermore, there would be no increase in the number of lockers, which are needed to address current and future member requirements. Squire Johns would also have to be moved outdoors again, as there would be no provision for an indoor space during or after the transition. The lack of these upgrades would strain the existing facilities, reduce convenience for members, and limit the club’s ability to adapt to growing needs. Moreover, it could impact the club’s ability to attract new members, as the facilities may no longer align with the expectations of prospective families or individuals seeking a modern and accommodating club environment.

Featured Videos

Craigleith Base Lodge Expansion

Investing in Our Community

By investing in this expansion, we’re not only improving our facilities but also strengthening our community. This project will enhance the overall member experience and position our club for long-term success.

Stay Tuned for More

As the project progresses, we’ll keep you informed through dedicated updates in the Club Bulletin, on our website, and at in-person member meetings. You’ll have opportunities to learn more about the project, including the latest timelines, design details, and how it will enhance your club experience. Your input is invaluable to us as we work to create a space that meets the needs of our members.

Scroll to Top